Tech 19 sources 2 updates
Uraloğlu: Production of second National High-Speed Train set begins
Transport and Infrastructure Minister Abdulkadir Uraloğlu stated mass production has started on the TÜRASAŞ-developed train, targeting 14 train sets with 7 each in 2027 and 2028. The 8-car sets seat 577 passengers; the first set reached 250 kilometers per hour in tests.